Field Insights: Conducting Density Tests After Rainfall – A Real-World Scenario

During the construction of a 1.2 km roadway, we reached a key milestone — the placement, grading, and compaction of a 150 mm thick limestone base course. The material had a specified Maximum Dry Density (MDD) of 2153 kg/m³, with an Optimum Moisture Content (OMC) of 8%. As preparations were made to carry out density… Read More Field Insights: Conducting Density Tests After Rainfall – A Real-World Scenario